Charlotte Air Traffic Control Tower

Archer Western Construction served as the general contractor on the 370 foot tall tower. Due to the design and schedule of this project, the epoxy intumescent portion of this project had to be completed in a temporary shop constructed by Specialty Spray Systems on site. The nearly 3,000 gallons for Carboline’s Thermolag E100 was applied on the ground while the 1,200 bags of Monokote Z106 was installed atop the structure.

Project Gallery

Project Details

  • Client: Archer Western Construction

  • Location: Charlotte Douglas International Airport Charlotte, NC

  • Scope: Monokote Z106 Medium Density Fireproofing. Carboline Thermolag Epoxy Intumescent Fireproofing

  • Duration: 10 months

Charlotte Air Traffic Control Tower

Archer Western Construction served as the general contractor on the 370 foot tall tower. Due to the design and schedule of this project, the epoxy intumescent portion of this project had to be completed in a temporary shop constructed by Specialty Spray Systems on site. The nearly 3,000 gallons for Carboline’s Thermolag E100 was applied on the ground while the 1,200 bags of Monokote Z106 was installed atop the structure.

Project Gallery

Project Details

  • Client: Archer Western Construction

  • Location: Charlotte Douglas International Airport Charlotte, NC

  • Scope: Monokote Z106 Medium Density Fireproofing. Carboline Thermolag Epoxy Intumescent Fireproofing

  • Duration: 10 months

More Projects