Project Description
Do You Have a Project We Can Help With?
Charlotte Air Traffic Control Tower
Archer Western Construction served as the general contractor on the 370 foot tall tower. Due to the design and schedule of this project, the epoxy intumescent portion of this project had to be completed in a temporary shop constructed by Specialty Spray Systems on site. The nearly 3,000 gallons for Carboline’s Thermolag E100 was applied on the ground while the 1,200 bags of Monokote Z106 was installed atop the structure.
Project Gallery
Project Details
Client: Archer Western Construction
Location: Charlotte Douglas International Airport Charlotte, NC
Scope: Monokote Z106 Medium Density Fireproofing. Carboline Thermolag Epoxy Intumescent Fireproofing
Duration: 10 months
Charlotte Air Traffic Control Tower
Archer Western Construction served as the general contractor on the 370 foot tall tower. Due to the design and schedule of this project, the epoxy intumescent portion of this project had to be completed in a temporary shop constructed by Specialty Spray Systems on site. The nearly 3,000 gallons for Carboline’s Thermolag E100 was applied on the ground while the 1,200 bags of Monokote Z106 was installed atop the structure.
Project Details
Client: Archer Western Construction
Location: Charlotte Douglas International Airport Charlotte, NC
Scope: Monokote Z106 Medium Density Fireproofing. Carboline Thermolag Epoxy Intumescent Fireproofing
Duration: 10 months